        SteelFlow Humber Bridge Case Study

        Case Studies

        SteelFlow Humber Bridge Case Study

        Application opportunity

        The Humber Bridge’s surface is a dual carriageway designed to tolerate constant motion and bends of more than three meters in winds of up to 80 miles per hour.


        Recommended product

        Due to the complexity of the requirements, 6 SteelFlow was the ideal material choice for this application.



        Results and benefits

        The material has been monitored as part of our in-house Grip Test programme. Installed in 2017, SteelFlow continues to maintain its SCRIM values.

        Products used:

        SteelFlow