        Application opportunity

        The A630 Rotherway roundabout is a major arterial route linking to M1 Junction 33 in South Yorkshire. 

        Recommended product

        14mm SteelSurf was recommended for this application due to its ability to perform under extreme stresses and resist deformation while providing a high skid resistance.

        Results and benefits

        SteelSurf significantly improved performance. The local authority reduced its carbon impact by 21 kg CO2e per tonne of asphalt.

        Products used:

        SteelSurf